1. Home
  2. /
  3. Efficient Transport Solution for...

Efficient Transport Solution for House Module Factory

14.01.2021
by editorial staff WORLD OF INDUSTRIES

#

Lindbäcks Bygg AB – a company in the industrial production of house modules for multi-family houses – has equipped its modern plant in Piteå, northern Sweden, with a long-distance transport system. A main supplier of the transport solution is Nord Drivesystems.

The 322 m long and 96 m wide manufacturing hall of the “super factory” has a production and logistics area of 31,000 square meters and was designed in a way that matches all processes. Digitalisation and automation solutions had a key role here. The aim: a leaner production and therefore an efficiency increase. 40 square metres of flat modules are to be manufactured every half hour. That is 1,600 apartments per year and places high demands on operational safety.

Gear Units and Motors from the Drive Specialist

A material train supplies materials for roofs and walls at the different workstations. Nail machines deliver pre-nailed panels and long conveyor belts successively feed the future house modules. The drive and control devices of all these transport solutions, machines and assembly lines collect their power from a large number of geared motors and frequency inverters – of which almost 70 percent come from the North German drive specialist Nord Drivesystems.

Low operating costs

The drive system of the conveyor system move goods at great distances with low operating costs and energy-saving functions. A simple installation using industrial plug connectors ensures a quick and faultless installation whilst, at the same time, an easy replacement. “Each movement must be performed with maximum safety and reliability. Therefore, we have a large range of mechanical, electrical and electronic drive technology – from energy-efficient geared motors right up to matching drive electronics, decentralised or in the control cabinet,” emphasises Thobias Sundström, account manager at Nord Drivesystems.

Optimised transport of material

The material supply train not only provides smooth deliveries to the various mounting stations, but also reduces the number of trucks in the factory, thereby increasing safety. The supply train also helps to streamline the packing work at the logistics department. The carriages follow a certain timetable and are loaded with exactly the material that the respective assembly station needs. Since the material train is very long, the carriages have been equipped with a positioning system. This function of the Nord Drivesystems’ drive electronics helps at the unloading and loading stations: It serves the driver to know exactly where the trailer is.

Environmentally friendly and Sustainability

The “super factory” does not only support an automated and lean production to create a leading and modern industrial house production. At least as important is to create a production facility that is as environmentally and sustainably as possible. Therefore, the new factory has solar panels on the roof, which account for a large part of the annual electricity requirement.

Source: Nord Drivesystems

Jetzt Newsletter abonnieren

Technologische Innovationen und Branchentrends aus allen Teilbereichen der Fluidtechnik –
Verpassen Sie nicht unsere besten Inhalte

Hier registrieren

Weitere Artikel

Organisational Change
Organisational Change

At the end of February, Johannes Schubert took over the role of Head of Sales at Gerhard Schubert from Martin Sauter, who is relinquishing the position for health reasons.

FBL Filling
FBL Filling

Ampack is breaking new ground in the filling of liquid food: the Syntegon company is completing its modular portfolio with the flexible FBL filling machine for preformed HDPE, PP, and PET bottles. With this expansion, Ampack is consolidating its position as a world market leader for aseptic applications.

Financial Year
Financial Year

KSB closed the 2023 financial year with record figures for order intake and sales revenue. The EBIT margin (earnings before finance income / expense and income tax) of 7.9 % reached the level originally targeted for 2025.

New Head
New Head

H2O from Steinen in Baden is delighted to have a new Head of Process Design: Fabian Argast, Master of Science in Chemistry, took over as Head of Application Technology in February 2024 – and is now looking for people to join his team.